Features
1, Rich colors. The blades could be white, orange, yellow, blue, green, mixed, and any other color.2, Various voltages. 3 phase AC output, suitable for charging 12V, 24V, 48V batteries.
3, One-piece Blade design ensures higher rotational stability, low noise.
4, Coreless generator means lower start torque, lower start wind speed, longer service life.
5, RPM limit protection. The RPM is kept under 300 regardless of high wind speed which prevents –the controller from over-load.
6, Easy installation. Full set of fasteners and installation tools are attached in the package.
7, Long service life. The turbine could work 10~15 years under normal natural environments
Specifications
item | FS-50 | ||||
Started wind speed | 1.3 m/s | ||||
Cut-in wind speed | 2.5 m/s | ||||
Rated Wind speed | 11 m/s | ||||
Rated voltage (AC) | 12/24V | ||||
Rated power(W) | 50W | ||||
Max power(W) | 55W | ||||
Wheel diameter(m) | 0.4 | ||||
weight | <19Kg | ||||
Blades height(m) | 0.9m | ||||
Safe wind speed | ≤40m/s | ||||
Blades quantity | 2 | ||||
Blade material | glass/basalt | ||||
Generator | Three phase permanent magnet suspension motor | ||||
Control System | Electromagnet | ||||
Generator protection grade | IP54 | ||||
Work environment temperature | -25~+45ºC, | ||||
Altitude: | ≤4500m | ||||
Overspeed protection | Electromagnetic brake | ||||
Overload protection | Electromagnetic brake and the unloading unit |
Attention
For correct installation and use of this equipment, please read carefully the safety warning and attention and strictly follow the instructions.
Basic requirements
Do not disassemble the equipment by yourself. Please contact the specified maintenance department when the equipment is out of order.
●Without authority, no company or individual are allowed to change the equipment structure, safety and performance design .
●please obey local laws and regulations when using this product
Assembly Requirements
1. Before the assembly of the wind generator or in the process of maintenance, please be sure to read the users manual first..
2. Please don’t install the wind turbines in rainy days or when the wind scale is at Level 3 or above.
3. After opening the package, it is advised to short circuit the three leads of the wind turbines (the exposed copper parts should be screwed together).
4. Before the installation of the wind turbine, lightning grounding must be prepared. You can arrange the facilities according to national standards, or you may arrange them according to the local environment and soil condition.
5.When assembling the Wind turbine, All the parts should be fastened with fasteners specified in table1.
5.When assembling the Wind turbine, All the parts should be fastened with fasteners specified in table2
6. Before the connection between the wind turbine flange and the tower flange, please connect the three leads of the wind turbine to the three leads of the tower accordingly. When using the hinge method, every pair of wires should be no less than 30mm in length and be wrapped with Acetate cloth tape for three layers, then sheathed with spun glass paint tube. With this method, connect the three pairs of wires (attention: the joint of the wires can’t bear the weight of the tower leads directly, so wires 100mm downward from the joint should be wrapped with adhesive tape and then stuffed into the steel pipe. After that, wind turbine flange and tower flange can be connected.
7.Before hoisting the wind turbines, the end (which should be connected with controller)of the tower lead should be cut away the insulating layer for 10mm or so. Then screw the three exposed leads (shot circuit) together.
8. During the installation, it is prohibited to revolve the rotor blades roughly (the ends of wind turbine leads or the tower leads are short-circuited at this moment). Only after all the installation and the examination is finished and the security of the erection crew is guaranteed, it is allowed to dismantle short circuited leads and then connect with controller and battery before running.